// NSA Designs · Blog
AI in the real world.
Thinking on AI adoption, analytics infrastructure, and the operator decisions that separate teams shipping AI from teams still planning it.
ReceiptsCI/CD
Merging to main stopped meaning production
Merging to main used to deploy production. Four PRs in 2 h 50 min (measured) made it deploy UAT behind a regression gate; prod ships on a manual Promote.- Before
- merge = prod
- After
- merge = UAT gate
A production hotfix drill in nine minutes of machine time
A seeded production-down drill, not a live outage: diagnose, human approval, three parallel racers, gatekeeper GO. 548 seconds (measured) of machine time.- Before
- about 2 hours
- After
- ~9 min